Client: Energy Solutions (for Magnox)

Project: Processing of Intermediate Level Waste

Location: Sizewell B Power Station, Suffolk

Project Cost: £6.1m

Description: Extraction of ILW from on-site vaults into containment vessels where the material was further processed before sealing into long term storage vessels (Ductile Cast Iron Containers).

Our Input: A number of changes occurred during the processing and we were consulted to provide advice on contractual matters for the valuation of the changes and to provide input into applications from the supply chain.